tracking
The TDWorld Channel
Sign In | Support
Find videos or images
The CLNR project is trialing a range of innovative network technologies including electric energy storage. We have installed six energy storage batteries of varying sizes, at strategic points on the Northern Powergrid electricity distribution network, watch a time lapse video showing the work that went into installing our largest 2.5WVa/5MWH battery at Rise Carr in Darlington.
Share This
Embed
Email
327 views | Added Mar 4, 2014 | Rate View top rated
Comments (0)
Add your comment